First thing we did was lay down the framing for the footing before pouring concrete
Pouring concrete into the footing frame we built.
Pouring concrete into the foundation walls.
Preparing the basement floor before pouring concrete.
Placing the first floor trusses on top of the foundation walls.
We placed the subfloor on top of the floor trusses along with the first walls.
More walls being added to the first floor.
2nd floor trusses being added on tope of the first floor walls.
2nd floor walls being added.
These are 19′ ft. walls because the living room will be completely open ceiling.
North end view of the open basement.
Stone Lake Project 1
Information
Location: 1513 Shoreline Dr. | Salina, KS
Project Type: New Construction
Floors: 2 Floors + Basement
Size: 3,250 Sq. Ft. | 2 Car Garage, 5 Bedrooms, 3 bathrooms, 2 Offices, Gameroom
Key Features: Open Living Room/Kitchen, Open Basement, Back Roof Porch, 18 ft. Ceilings, Shed
Completion: End of 2023