First thing we did was lay down the framing for the footing before pouring concrete

Pouring concrete into the footing frame we built.

Pouring concrete into the foundation walls.

Preparing the basement floor before pouring concrete.

Placing the first floor trusses on top of the foundation walls.

We placed the subfloor on top of the floor trusses along with the first walls.

More walls being added to the first floor.

2nd floor trusses being added on tope of the first floor walls.

2nd floor walls being added.

These are 19′ ft. walls because the living room will be completely open ceiling.

North end view of the open basement.

Stone Lake Project 1

INFORMATION

  • Location

    1513 Shoreline Dr. Salina, KS

  • Floors

    2 Floors | 1 Basement

  • Size

    7,230 SF | 2 Car Garage, 5 Bedrooms, 3 bathrooms, 2 Offices, Gameroom

  • Key Features

    Open Living Room/Kitchen, Open Basement, Back Roof Porch, 18 ft. Ceilings, Shed

  • Completion

    2026

100%
Progress
0

Square Footage

0 '

Ceilings

0

Bedrooms

FINAL PICTURES

FOUNDATION

Click Here
Click Here
Click Here
Click Here
Click Here

FINAL PICTURES

FRAMING

Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here
Click Here

Video Series

7 Videos

Coming Soon

Description

We had the basement dugout and then framed the footings. From there we poured concrete into the footing frame and began setting up the foundation walls. After pouring concrete for our foundation, we then prepared the basement and garage floors. The basement was then complete and ready for framing.